If you’re in Hyderabad and must apply for a new HESCO connection, you can do it quickly and conveniently online. The process is designed to be user-friendly, allowing you to fill out an application form from the comfort of your home. Once you submit your application, the HESCO Electricity New Connection (ENC) team will handle the rest, ensuring a smooth experience without the need for long waits at the office.
How to Apply for a HESCO New Electricity Meter Connection
To get started, visit the Electricity New Connection (ENC) portal. The application process consists of several simple steps. Before you begin, make sure you have the following documents ready:
A copy of a recent HESCO electricity bill from a neighbour.
Proof of property ownership.An attested copy of your CNIC (Computerized National Identity Card).
An attested CNIC copy of a witness.
A wiring contractor’s test report for your property.
1. Access the ENC Portal: Open the online application portal on your computer.
2. Click “Apply”: Find and click the "Apply" button on the homepage.
3. Enter your Neighbor’s Reference Number: This will auto-fill their details, making it easier for you.
4. Select Load Requirement: Choose 5 KW for domestic connections or a higher value for industrial or commercial needs.
5. Choose Connection Type: Select “Domestic” for residential connections or other options as applicable.
6. Specify Your Role: Indicate if you’re a tenant or landlord.
7. Fill in Your Name: Provide your full name along with your father’s or husband’s name.
8. Enter CNIC and Address: If you’re Pakistani, select the first option and enter your CNIC number and address.
9. Provide Contact Numbers: Include your personal number and a secondary contact number.
10. Auto-fill Details: If you’re the applicant, you can select “Same as Above” to fill in your details automatically.
11. Existing Meter Status: Indicate whether you have an existing electricity meter (enter “0” if you don’t).
12. Specify Installation Address: Provide the address for the new meter installation.
13. List Your Appliances: Mention the number of appliances you have at home (e.g., air conditioners, fans).
14. Upload Required Documents: Use the “Browse” button to upload your documents.
15. Review and Agree: Check all entries, read the terms, and click “I Agree.”
16. Complete Captcha: Enter the displayed numbers and click “Submit” to finalize your application.
Checking the Status of Your HESCO Bill Application
After submitting your application, you’ll receive a tracking number to monitor its status. Here’s how to check:
Visit the ENC Portal: Go back to the ENC portal.
Click “Track”: Find and click the “Track” button on the left side.Select Application Type: Choose “New Connection” to track your application status.
Choose Distribution Company: Select HESCO from the dropdown menu.
Enter Tracking Number: Input the tracking number you received after application submission.
HESCO Bill Demand Notice
How to Apply for a Demand Notice Online?
Go to the ENC Portal: Access the ENC portal again.
Click “Print”: Click the “Print” button on the left side.Select Application Type: Choose "New Connection."
Enter Tracking Number: Input your application tracking number and click “Submit.”
Download or Print: Review your demand notice form and select your preferred option to download or print.
Tip: Pay the demand notice fee at your nearest bank to speed up the process.
Submitting HESCO Bill Demand Notice Online
After paying the fee, you can submit your demand notice online. Ensure you have a scanned copy of the payment ready.
Visit the ENC Portal: Open the ENC portal.
Select “Upload”: Click the “Upload” option.Choose Application Type: Select "New Connection."
Enter Tracking Number: Input your tracking number and click submit.
Upload Payment Confirmation: Upload the scanned copy of the paid demand notice.
Note: If you complete your payment and upload the notice promptly, your new connection will be installed within 15 days.
HESCO Bill Demand Notice Charges 2024
The demand notice fee consists of fixed and variable charges based on various factors, including:- Service Line Length: Longer lines may incur higher costs.
- Connection Type: Fees differ for single-phase and three-phase connections.
- Location: Charges may vary for urban and rural areas.
- Service Line Length: Longer lines may incur higher costs.
- Connection Type: Fees differ for single-phase and three-phase connections.
- Location: Charges may vary for urban and rural areas.